Aggregate Industries PLC   Aggregate Industries UK | Holcim Group
A member of the Holcim Group
 
US Overview Regional Businesses Products & Services Health & Safety Environment News Employment Contact
West Central Region: Aggregate | Recycling | Asphalt | Contracting | Ready Mixed Concrete | Supplies

West Central Division Ready Mix Division

Volume Calculators

Determine the Volume of a Slab:
Enter the length (in feet), width (in feet), and depth (in inches) of the slab, and click "calculate" to determine the amount of cubic yards required.

Length (feet)
Width (feet)
Depth (inches)
  calculate
Cubic Yards Required
Slab Illustration

Determine the Volume of a Wall:
Enter the length (in feet), height (in feet), and width (in inches) of the wall, and click "calculate" to determine the amount of cubic yards required.

Width (feet)
Length (feet)
Depth (inches)
  calculate
Cubic Yards Required
Wall Illustration

 

Determine the Volume of a Caisson:
Enter the diameter (in inches) and the total length (in feet) of the caisson, and click "calculate" to determine the amount of cubic yards required.

Length (feet)
Diameter (inches)
  calculate
Cubic Yards Required
Caisson Illustration

DISCLAIMER: Job site conditions, grades, and other variables will determine the exact volume requirements. This calculator is provided for general information and illustration purposes only. Aggregate Industries cannot guarantee the accuracy of this calculator or its applicability to your circumstances and cannot accept responsibility for any error in ordering or placement as a result of its use.

For more assistance or information, please contact our knowledgable Sales Team.

Aggregate | Recycling | Asphalt | Contracting | Ready Mixed Concrete | Supplies | Employment | @Work | Contact Joe's Rocks
WEST CENTRAL REGION: 1687 Cole Blvd., Suite 300 Golden, CO 80401 Tel: 303-985-1070 Fax: 303 716-5295